Skip to content
Work / Index

Forty-one systems. Twelve we can talk about.

Every entry names the mechanism, the measurement, and what we would do differently. The rest are under NDA — ask and we will walk you through them on a call.

Portfolio at a glance
In production today 33
Longest running 6 yrs
Handed over in full 100%
LogisticsW—01

Atlas Freight — dispatch that explains itself

A routing assistant that proposes, shows its reasoning trace, and waits for a dispatcher. Eleven months in production across four depots.

Read the case study
HealthcareW—02

Vero Health — triage notes in 40 seconds

Clinician-reviewed summarisation with a full audit trail on every generated line.

Read the case study
FintechW—03

Northbank — reconciliation without the spreadsheet

Nightly matching across seven ledgers, with exceptions routed to a named analyst.

Read the case study
Public infrastructureW—04

Muni Grid — outage triage for a two-person desk

Sensor fusion and a ranked work queue that a duty operator can override in one click.

Read the case study
LegalW—05

Fenwick & Roe — disclosure review with citations

Retrieval over 2.1M documents where every answer links back to the source page.

Read the case study
LogisticsW—06

Kessler Rail — maintenance windows that hold

Forecasting plus a scheduling UI that makes the constraint visible before it bites.

Read the case study
ResearchW—07

Halden Labs — an eval harness they now run themselves

The measurement layer first: datasets, scoring, and a weekly regression report.

Read the case study
Across the portfolio
6 wks
Median brief to release
0.93
Mean eval pass at launch
99.98%
Uptime, trailing 12 mo
4
Builds we stopped in discovery
Available — Q4 2026

Want the version of this with your data in it?

We will show you the two projects closest to your problem, including the parts that went badly.